The tile is being installed over the radiant heating.
The tile installed in front of the fire place.
Sunday, June 29, 2008
The radiant floor is down and some of the tile
The radiant floor is installed in the kitchen and dining room area.
The tile is installed in the utility/laundry room.
More building at Wilhelmus Dairy
Head locks and feed lane for the dry cows.
Pipe for the free stalls.
Feed lane and head locks for more dry cows.
Purlin and I-beam material for the free stall roof.
Pipe for the free stalls.
Feed lane and head locks for more dry cows.
Purlin and I-beam material for the free stall roof.
HOLY COW... Did somebody say floor warmer??
The orange stacks are the coils for the radiant eating.
Finally..... this has been the whole delay in the house.
Finally..... this has been the whole delay in the house.
More of the house...
Utility room....still no tile yet.
The desk area.
The kitchen (no appliances yet.... and the backsplash has to be
redone. (JUST MY LUCK!)
The desk area.
The kitchen (no appliances yet.... and the backsplash has to be
redone. (JUST MY LUCK!)
The house now...
New cedar posts on the front porch and picture windows.
Maeleigh's room with the new carpet.
Gracelyn's room with the new carpet, too.
The girl's bathroom ( The door is reflected
in the mirror because it is leaning agaist the wall)
Maeleigh's room with the new carpet.
Gracelyn's room with the new carpet, too.
The girl's bathroom ( The door is reflected
in the mirror because it is leaning agaist the wall)