Wednesday, October 1, 2008
More work to do....
There is still more work going on... more headlocks, loops
and more metal. Javier and his crew of men are working
everyday, except Sunday. Keep "watching" and there are
more changes coming everyday.
Working on freestalls over the feed lane
The purlins over the feed lane will soon be covered with a roof.
Arjen and Javier, the contractor, had to move this light pole. This light pole was twelve feet in the ground.
And they got it out...without any destruction.

Thursday, July 3, 2008
Sunday, June 29, 2008
Working right along...
The tile is being installed over the radiant heating.
The tile installed in front of the fire place.
The tile installed in front of the fire place.
The radiant floor is down and some of the tile
The radiant floor is installed in the kitchen and dining room area.
The tile is installed in the utility/laundry room.
More building at Wilhelmus Dairy
Head locks and feed lane for the dry cows.
Pipe for the free stalls.
Feed lane and head locks for more dry cows.
Purlin and I-beam material for the free stall roof.
Pipe for the free stalls.
Feed lane and head locks for more dry cows.
Purlin and I-beam material for the free stall roof.
HOLY COW... Did somebody say floor warmer??
The orange stacks are the coils for the radiant eating.
Finally..... this has been the whole delay in the house.
Finally..... this has been the whole delay in the house.
More of the house...
Utility room....still no tile yet.
The desk area.
The kitchen (no appliances yet.... and the backsplash has to be
redone. (JUST MY LUCK!)
The desk area.
The kitchen (no appliances yet.... and the backsplash has to be
redone. (JUST MY LUCK!)
The house now...
New cedar posts on the front porch and picture windows.
Maeleigh's room with the new carpet.
Gracelyn's room with the new carpet, too.
The girl's bathroom ( The door is reflected
in the mirror because it is leaning agaist the wall)
Maeleigh's room with the new carpet.
Gracelyn's room with the new carpet, too.
The girl's bathroom ( The door is reflected
in the mirror because it is leaning agaist the wall)
Tuesday, May 6, 2008
Top Spot
Billy Wilson and his crew from Top Spot
were hired to do our cabinets and counter tops!
Great attention to detail. Would recommend them
to everyone needing his expertise!
TV cabinetDesk and upper cabinet
Kitchen cabinets
Another view of the kitchen